Up a level |
Khaw, K. W. and Chew, X. Y. and Teh, X. Y. and Yeong, W. C. * (2019) Optimal variable sample size and sampling interval control chart for the process mean based on expected average time to signal. International Journal of Machine Learning and Computing, 9 (6). pp. 880-885. ISSN 2010 3700
Chew, X. Y. and Khaw, K. W. and Yeong, W. C. * (2020) The efficiency of run rules schemes for multivariate coefficient of variation: A Markov chain approach. Journal of Applied Statistics, 47 (3). pp. 460-480. ISSN 1360-0532
Chew, X. Y. and Khoo, B. C. and Khaw, K. W. and Yeong, W. C. * and Chong, Z. L. (2019) A proposed variable parameter control chart for monitoring the multivariate coefficient of variation. Quality and Reliability Engineering International, 35 (7). pp. 2442-2461. ISSN 0748-8017